Sig Kadet - Twin Otter winter project

Started by Michael, December 23, 2020, 10:28:07 AM

Previous topic - Next topic

0 Members and 2 Guests are viewing this topic.

Michael

More work on the nacelles, and aileron servos being fitted.
Michael

Michael

Basic construction and assemble is as per the plans and instructions.

The pushrods are constructed (circa 1980-style) of ΒΌ" square balsa and wire bound together with thick thread and glue.

Michael

Michael

Covering started.

Michael

Michael

More covering.

Michael

Andy Hoffer

Nice covering job @Michael.   Even the Pink Panther is smiling!

Andy

Michael

More covering. I still have to complete the radio and power system installations.

Michael

GuyOReilly

Looking good Michael.
Was the lighting graphic a sticker or Monokote job?
Guy

Michael

Michael

sihinch

Looks great. We could be Twin twins!

bfeist

"Winter project" - finishes Jan 7. I think we need to take away half of your tools or something to slow you down. What a great result!

Michael

More covering, trim decoration and landing gear installation. (First flight is likely to be off skis.)

Michael

Michael

Michael

electroflyer

 

Michael

All finished, except throws need to be adjusted. To be maidened off snow. (More detailing after the maiden. I hope.)

Michael

Frank v B

Yep, a Sig Cadet alright...from another planet. 
What a great kit bash.  Good job. ;D

Frank

"Never trade luck for skill"